Bid Number Title Due Date Other Files Tab Sheet
13-13 RFB For Transformers Thu, 05/23/2013 - 06:00pm 13-13-tab-binder1.pdf
13-12 RFQ for Fire Hydrants, Valves and Extensions Tue, 06/04/2013 - 07:00pm - 13-12-tab-fire-hydrants-valves-and-extensions-06-04-13-web.pdf
13-11 RFQ for Sewer Clean Out Boxes Wed, 05/29/2013 - 08:00pm - 13-11-tab-sewer-clean-out-boxes-05-29-2013-web.pdf
13-10 RFQ for armor rods, side dist ties, double side dist ties, double support dist ties, straight dist ties, dist grips, spool ties, guy grips, slack span dead-ends and double side ties Wed, 06/05/2013 - 07:00pm - 13-10-tab-corrected-armor-rods-side-dist-ties-etc-06-04-13-1-web.pdf
13-09 RFQ for Darling Hydrant Extensions Wed, 05/01/2013 - 07:00pm - 13-09-tab-darling-hydrant-extensions-05-1-2013-web.pdf
13-08 RFB for Herbicides Thu, 03/21/2013 - 07:00pm - 13-08-tab-herbicides-03-21-2013-web.pdf
13-07 RFB for Couplings, Valves, Stops, Repair Clamps, and Tapping Saddles Thu, 03/28/2013 - 06:00pm - 13-07-tab-couplings-valves-stops-etc-03-28-2013-web.pdf
13-06 RFQ for Ball Valves and Strainers Thu, 03/07/2013 - 09:00pm - 13-06-tab-ball-valves-and-strainers-03-07-13-web.pdf
13-05 RFP for City of Greenville and Greenville Utilities Commission Benefit Consultant Thu, 03/14/2013 - 09:00pm 13-05-rfp-for-city-of-greenville-and-guc-benefit-consultant-03-14-13-award-notice.pdf
13-04 RFB for Load Management Switches Wed, 03/20/2013 - 06:00pm - 13-04-tab-load-mgr-switches-03-20-13-web.pdf
13-03 RFP for Natural Gas Distribution System Leak Detection Survey Fri, 03/01/2013 - 09:00pm 13-03-tab-rfp-for-2013-leak-detection-survey-tab-web.pdf
13-02 RFB For Water & Sewer Materials Fri, 02/15/2013 - 08:00pm - 13-02_tab_results_water_sewer_materials_bid_tab_02_15_13_-_web.pdf
13-01 Transformers RFB Thu, 02/07/2013 - 07:00pm - 13-01_tab_sheet_transformers_combined_web.pdf
12-58 RFB for One (1) 60’ Aerial Tower Unit Mounted with Utility Line Body & 1,250 lbs. Material Handling Package Wed, 11/03/2021 - 07:00pm - -
12-49 Couplings and Caps Tue, 01/29/2013 - 08:00pm - 12-49_tab_sheet_couplings_caps_01_29_2013.pdf
12-48 Design and Installation of Cathodic Protection Rectifier and Anode Bed Fri, 01/25/2013 - 09:00pm 12-48-tab-rfq-for-design-and-installation-of-cathodic-protection-rectifier-and-anode-bed-tab-web.pdf
12-47 Construction of the partial roof replacement of the Old Engineering Building, Revision 1 Wed, 12/19/2012 - 07:00pm 12-47_tab_guc_bid_rejection.pdf
12-46 Advertisement for Utility Poles Fri, 11/09/2012 - 07:30pm - -
12-45 RFB for approximately 30,000' of 2/0 Triplex Cable "Shaw" and 99,000' of 1/0 UG Primary Cable Wed, 11/07/2012 - 07:00pm - 12-45_tab_cable_tabulation_11_07_12_bid_tab_web.pdf
12-44 RFQ for Dead-End Shoes, Stirrup Clamps, Cable Clamps, Strandvises And Guy Guards Thu, 11/01/2012 - 07:00pm - 12-44_tab_dead_end_shoes_etc_11_01_12_tab_web.pdf
12-43 RFB for Employee Uniforms Wed, 11/14/2012 - 07:00pm - 12-43_tab_employee_uniform_tab_-_web.pdf
12-42 RFB For Tubular Steel Structures For The MacGregor Downs Road and B's Barbecue Road Engineered Distribution Poles Thu, 11/08/2012 - 08:30pm 12-42_tab_tubular_steel_structures_11_08_12_-_tab_-_website.pdf
12-41 RFP for (1) One Pre Engineered Constructed Metal Building Wed, 10/24/2012 - 08:00pm 12-41_tab_one_pre_engineeded_constructed_metal_building_10_24_12_-_web.pdf
12-40 RFB For Crushed Stone Thu, 10/18/2012 - 06:00pm 12-40_tab_results_crushed_stone_10_18_12_approval_-_web.pdf
12-39 RFB for Light Bulbs Thu, 10/04/2012 - 07:00pm - 12-39_tab_sheet_light_bulbs_10_04_12_web.pdf