13-13 |
RFB For Transformers |
Thu, 05/23/2013 - 06:00pm |
|
13-13-tab-binder1.pdf
|
13-12 |
RFQ for Fire Hydrants, Valves and Extensions |
Tue, 06/04/2013 - 07:00pm |
- |
13-12-tab-fire-hydrants-valves-and-extensions-06-04-13-web.pdf
|
13-11 |
RFQ for Sewer Clean Out Boxes |
Wed, 05/29/2013 - 08:00pm |
- |
13-11-tab-sewer-clean-out-boxes-05-29-2013-web.pdf
|
13-10 |
RFQ for armor rods, side dist ties, double side dist ties, double support dist ties, straight dist ties, dist grips, spool ties, guy grips, slack span dead-ends and double side ties |
Wed, 06/05/2013 - 07:00pm |
- |
13-10-tab-corrected-armor-rods-side-dist-ties-etc-06-04-13-1-web.pdf
|
13-09 |
RFQ for Darling Hydrant Extensions |
Wed, 05/01/2013 - 07:00pm |
- |
13-09-tab-darling-hydrant-extensions-05-1-2013-web.pdf
|
13-08 |
RFB for Herbicides |
Thu, 03/21/2013 - 07:00pm |
- |
13-08-tab-herbicides-03-21-2013-web.pdf
|
13-07 |
RFB for Couplings, Valves, Stops, Repair Clamps, and Tapping Saddles |
Thu, 03/28/2013 - 06:00pm |
- |
13-07-tab-couplings-valves-stops-etc-03-28-2013-web.pdf
|
13-06 |
RFQ for Ball Valves and Strainers |
Thu, 03/07/2013 - 09:00pm |
- |
13-06-tab-ball-valves-and-strainers-03-07-13-web.pdf
|
13-05 |
RFP for City of Greenville and Greenville Utilities Commission Benefit Consultant |
Thu, 03/14/2013 - 09:00pm |
|
13-05-rfp-for-city-of-greenville-and-guc-benefit-consultant-03-14-13-award-notice.pdf
|
13-04 |
RFB for Load Management Switches |
Wed, 03/20/2013 - 06:00pm |
- |
13-04-tab-load-mgr-switches-03-20-13-web.pdf
|
13-03 |
RFP for Natural Gas Distribution System Leak Detection Survey |
Fri, 03/01/2013 - 09:00pm |
|
13-03-tab-rfp-for-2013-leak-detection-survey-tab-web.pdf
|
13-02 |
RFB For Water & Sewer Materials |
Fri, 02/15/2013 - 08:00pm |
- |
13-02_tab_results_water_sewer_materials_bid_tab_02_15_13_-_web.pdf
|
13-01 |
Transformers RFB |
Thu, 02/07/2013 - 07:00pm |
- |
13-01_tab_sheet_transformers_combined_web.pdf
|
12-58 |
RFB for One (1) 60’ Aerial Tower Unit Mounted with Utility Line Body & 1,250 lbs. Material Handling Package |
Wed, 11/03/2021 - 07:00pm |
- |
- |
12-49 |
Couplings and Caps |
Tue, 01/29/2013 - 08:00pm |
- |
12-49_tab_sheet_couplings_caps_01_29_2013.pdf
|
12-48 |
Design and Installation of Cathodic Protection Rectifier and Anode Bed |
Fri, 01/25/2013 - 09:00pm |
|
12-48-tab-rfq-for-design-and-installation-of-cathodic-protection-rectifier-and-anode-bed-tab-web.pdf
|
12-47 |
Construction of the partial roof replacement of the Old Engineering Building, Revision 1 |
Wed, 12/19/2012 - 07:00pm |
|
12-47_tab_guc_bid_rejection.pdf
|
12-46 |
Advertisement for Utility Poles |
Fri, 11/09/2012 - 07:30pm |
- |
- |
12-45 |
RFB for approximately 30,000' of 2/0 Triplex Cable "Shaw" and 99,000' of 1/0 UG Primary Cable |
Wed, 11/07/2012 - 07:00pm |
- |
12-45_tab_cable_tabulation_11_07_12_bid_tab_web.pdf
|
12-44 |
RFQ for Dead-End Shoes, Stirrup Clamps, Cable Clamps, Strandvises And Guy Guards |
Thu, 11/01/2012 - 07:00pm |
- |
12-44_tab_dead_end_shoes_etc_11_01_12_tab_web.pdf
|
12-43 |
RFB for Employee Uniforms |
Wed, 11/14/2012 - 07:00pm |
- |
12-43_tab_employee_uniform_tab_-_web.pdf
|
12-42 |
RFB For Tubular Steel Structures For The MacGregor Downs Road and B's Barbecue Road Engineered Distribution Poles |
Thu, 11/08/2012 - 08:30pm |
|
12-42_tab_tubular_steel_structures_11_08_12_-_tab_-_website.pdf
|
12-41 |
RFP for (1) One Pre Engineered Constructed Metal Building |
Wed, 10/24/2012 - 08:00pm |
|
12-41_tab_one_pre_engineeded_constructed_metal_building_10_24_12_-_web.pdf
|
12-40 |
RFB For Crushed Stone |
Thu, 10/18/2012 - 06:00pm |
|
12-40_tab_results_crushed_stone_10_18_12_approval_-_web.pdf
|
12-39 |
RFB for Light Bulbs |
Thu, 10/04/2012 - 07:00pm |
- |
12-39_tab_sheet_light_bulbs_10_04_12_web.pdf
|